02 / PLAN THE WHOLE BUILD
A great setup starts below the counter.
Review the complete build with JEI, your vehicle builder,
and qualified installers before you purchase.
Space & workflow
Check dimensions, service clearances, counter strength,
storage, and staff movement from grinding to pickup.
Electrical & generator load
Review exact equipment voltage, amperage, circuits, and
connections alongside refrigeration, pumps, and other loads.
Have a qualified electrician assess simultaneous demand
and generator capacity.
Freshwater & wastewater
Plan tank capacity for drinks, rinsing, cleaning, and required
sinks. Confirm pump pressure, flow, water quality, and local
freshwater and wastewater requirements.
Plumbing & drainage
Coordinate supply lines, filtration access, shutoffs, drain
routing, and any backflow or air-gap requirements with your
installer and local authority.
Vibration & transport
Have your builder confirm weight distribution, secure mounting,
and transport protection. Follow manufacturer instructions
for shutdown, cooling, draining, and transport.
Installation readiness
Confirm utility readiness, installer responsibilities, local
approvals, and training needs. JEI’s service scope and
availability are defined in your proposal.